School Roofing in Arlington, TX

School Roofing

School roofing in Arlington, TX: wall flashing and backing repair, membrane work, rooftop units and drains, planned around classrooms, summer break and campus use.

Arlington took an EF-2 tornado on November 24, 2020, and school roofs here get hail and wind most springs. For Arlington High School or any other campus, what matters is what this building's membrane, wall flashing and roof penetrations look like now, and what each leak spot needs to be fixed properly.

On a school, the roof and the classrooms under it are one decision. Tell us which wing or roof section is leaking, what the roof is made of if you know, and who can let us up there. A school near Downtown Arlington still gets its own inspection. That way the district compares a complete repair against a cheap patch that leaves wall work out of the price.

School Roofing in Arlington, TX

Rebuilding the wall before reflashing

Our flashing failure repair on a school begins at the wall where the leak starts, usually a parapet, a gym wall rising above a lower roof or a wall around a mechanical area. We pull back the old flashing and check the sheathing and blocking behind it. Solid material stays. Rotted material gets replaced by the wall contractor, with an engineer involved if framing changes. Then we install new counterflashing up top and run the membrane up under it. Both pieces go in the same estimate. A bigger patch on the roof won't fix a rotten wall, and the leak comes back.

A water stain on a classroom ceiling tile is a good starting point, but water often runs along the deck before it drips, so the stain may not sit under the actual hole. We write down what we see and flag spots that need opening before we decide what stays. Photos taken while the wall is open show the district why it was rebuilt, since new flashing hides everything. The size of a stain can't tell anyone how far the damage runs outside, and the fact that it's a school doesn't tell us what's behind the flashing.

School Roofing in Arlington, TX

Membrane repair and wet insulation

A commercial roof repair follows the system on that section of the school. Plenty of campuses have a mix of roofs from different additions. We cut out membrane that's cracked, blistered or wet, clean the edges that stay and tie in new material the way that system needs. Old layers sometimes have to come off to reach a solid deck. TPO and PVC get heat-welded seams, while built-up and modified bitumen roofs use their own laps. A coating bid only covers the coating. It won't rebuild wall backing or relocate a rooftop unit, so we list those items next to the roof work they hold up.

When the plan keeps the existing insulation, we need to be confident it's dry. An infrared moisture survey looks at the scan alongside any roof drawings and the weather on the night it was taken. A warm spot is a lead, not a diagnosis. Where it matters, we take core cuts to see the layers and patch them the same day. Before cutting over a classroom, we check with the school about what's below. Structural or mechanical questions go to the right engineer. The repair is based on what we find in this roof, not on the 2020 tornado or the building being a school.

School Roofing in Arlington, TX

Rooftop units and drains

School roofs usually carry a row of packaged HVAC units, exhaust fans for kitchens and restrooms, and sometimes old abandoned curbs. When a repair reaches one of them, rooftop equipment curbs and supports work has to be planned with the district's mechanical contractor. They handle shutdowns, disconnects, lifting and clearance, and an engineer looks at any change to the curb or support. We explain what the curb has to look like before we flash it and the membrane detail we'll install after. More roofing money won't get the unit work done. The district needs to see the mechanical step and the roofing step side by side so both crews can be booked.

Drains in the repair area get the same attention. We check the drain body and clamping ring and note anything that has to be fixed before the new membrane ties in. Problems in the pipe below the roof go to a plumber, and changes to the drainage layout need a designer's review. Wall backing, curbs and drains each involve a different trade, but each has to be ready before we can finish the roof at that spot. Our finished seam doesn't approve the piping or the equipment. The proposal spells out who does what, along with the quantities, so the district isn't left guessing.

School Roofing in Arlington, TX

Working over classrooms

For occupied building reroofing at a school, we walk the facilities contact through where each opening will be, how big it is, how debris comes down and where materials sit. We ask the people who run that wing what's in the rooms, what classes or events are scheduled, and what can't be interrupted. The district's safety staff decide on protection, and we write those steps into the plan. Being allowed to inspect a roof doesn't make the classroom under it ready for a tear-off. We work from the school's real calendar and routes, not a generic summer-break assumption.

If we find more damage than expected, the opening may need to grow. We stop, show the facilities contact what we found and explain why more has to come out. The rooms under the new area get the same review for access, handling and protection before we continue. If we're waiting on the wall contractor or the HVAC crew, we seal the opening with a temporary roof so nothing gets wet. The revised price lists the added material, the temporary protection and the precautions together. That keeps anyone from assuming one room's plan covers the room next door that nobody has checked.

School Roofing in Arlington, TX

Closeout and what's still open

When the work is done, the closeout record shows the wall backing that was rebuilt, the roof removed and the new flashing installed. We list the core cuts we patched and the photos taken while things were open. Work still owed by the wall contractor, plumber or HVAC crew is listed separately from finished roofing. A good new seam doesn't approve an equipment change or answer a question about hidden piping. If another wall on the building still needs a closer look, we say where and why, rather than treating one repair as the fix for every leak on campus.

We schedule school roof inspections in Arlington through each building's facilities staff. College and university roofing follows what we find on those buildings, and government building roofing follows its own roofs. For your school, the repair is tied to what we found and the wall work it needs, with clear quantities and a record the next facilities person can follow.

Schools rarely sit empty. Classes, athletics, deliveries and maintenance all run on different schedules, and summer still brings camps and staff. The facilities contact can tell us which rooms are below the work and help set a realistic order around the real calendar. Our plan marks the work zone, shows how materials get up to the roof and explains how each day's opening is sealed before weather moves in. If interior protection or noise limits are needed, we agree on the areas and hours before we mobilize. When we find a wet deck or soaked insulation, we photograph it and review it with the school before the tear-off grows. Short daily updates keep administrators informed about which areas are affected and when a finished section can go back to normal use.

School Roofing in Arlington, TX

Common Questions

Does knowing it's a school tell you how the roof is built or how to get access?

No. We need the specific building and any roof drawings or repair history the district has. Access is set up through the facilities staff, and the repair is based on what we find at the wall and roof.

What should come with new wall flashing at the top of a parapet?

A repair to the sheathing behind it if it's rotted, done by the wall contractor first. Then we install new counterflashing and tie the membrane up under it. A patch on the roof alone doesn't fix the wall.

Does summer break mean the classrooms are ready for roof work?

Not automatically. Camps, staff and maintenance often use the building in summer. We show the district where we'll open the roof and how materials move, and their staff decide what has to happen in the rooms below first.

How do you record work another contractor still has to finish?

We list each open wall, HVAC or plumbing item and where it is on the roof. It stays separate from the roofing we finished and the core cuts we patched, so nothing gets signed off by mistake.